Catch-up sequence for Hugo. Renovating a sea foam from top to bottom while sharing your adventure on video is not always compatible. Especially when you arrive in the funnel at the end of the construction site, when the list of things to do is long and the time is not extensible..
This 9 e episode is an accelerated on the work carried out: installation of the engine, electricity, electronics, equipment and total renovation of the interior. And even if the steps are described more quickly than in previous episodes, the scope of the work and the quality of the realization remain exceptional!
On the eve of the launch, Hugo's Sea Foam is ready.